What to send your contractor
The information that turns a rough estimate into a firm, accurate price — and lets the build itself run without avoidable surprises.
Last reviewed 2026-09-07
The gap between a vague estimate and a firm, reliable price is almost always information. A contractor pricing from a floor plan and a conversation is guessing at quantities; a contractor pricing from full drawings, ground information and access photographs is quoting against something real.
You do not need every item on this list to start a conversation — send what already exists, and this page explains what still helps to gather as the project develops. The more of it that exists before pricing, the fewer assumptions sit inside the quote, and the fewer surprises appear once work is on site.
Quick answer
Send whatever already exists: drawings, planning decision, photographs and any survey or engineering information, even if incomplete.
The single most valuable items for an accurate price are scale drawings, structural engineer's details, and photographs of the access route.
Use the Send Us Your Plans upload page to send everything you have in one place and get a response based on real information.
The full checklist
This is the complete list a contractor would ideally see. Missing items are not a barrier to getting started — they simply mean the early quote will carry more assumptions until they are available.
Information to gather before contacting a contractor
- Full site address and postcode, with a map pin if the location is hard to find
- Photographs of the site itself, from several angles and in different weather if possible
- Photographs of the access route — the actual path a delivery vehicle would take
- Architect's drawings: plans, elevations and sections, to scale
- The planning decision notice, if permission has been granted or refused
- Any planning conditions attached to the decision, particularly pre-commencement conditions
- Building Regulations drawings, where produced separately from the planning set
- Structural engineer's drawings and calculations, including foundation and steel details
- Drainage design — existing and proposed foul and surface water layout
- A topographic survey, showing levels across the site
- Ground investigation results — trial pit logs, borehole data or a geotechnical report
- Utility information — known positions of water, gas, electricity and telecoms services
- A specification or schedule of works, if one has been prepared
- Your desired programme or start date, and any deadline driving it
- Your budget range, even approximate
- Any known constraints — access restrictions, working hours, protected trees, shared driveways
Why each item matters to pricing and build accuracy
Every item on the checklist removes a specific assumption from the quote and, later, from the build itself.
| Information | What it fixes for the contractor |
|---|---|
| Scale drawings | Sets the actual quantities of concrete, block, steel and drainage rather than estimated ones |
| Planning decision & conditions | Reveals conditions affecting sequencing, materials or pre-start approvals |
| Structural engineer's details | Fixes foundation depths, reinforcement and steel sizes that drive groundworks cost |
| Drainage design | Confirms pipe runs, invert levels and connection points before excavation starts |
| Topographic survey | Sets real levels, so cut-and-fill and retaining needs are known, not guessed |
| Ground investigation | Informs foundation type and depth, and flags problem ground early |
| Access photographs | Decides what plant size and delivery method is realistic, and whether a pump or crane is needed |
| Utility information | Avoids striking live services during excavation, and flags diversion costs |
| Budget and programme | Lets the contractor advise on what is realistic within the constraints, rather than pricing blind |
Why each checklist item earns its place
It helps to see the checklist as a set of specific questions a contractor otherwise has to guess the answer to. Working through why each item matters makes it easier to prioritise what to chase first if not everything exists yet.
- Full site address and a map pin — confirms exactly which plot, access route and local conditions apply before any quantities are worked out
- Site photographs from several angles — show existing ground cover, boundary treatments and obstructions that a plan alone will not reveal
- Access route photographs — the single biggest driver of plant choice, delivery method and whether a pump, crane or smaller machine is needed
- Architect's drawings to scale — the only reliable source for actual quantities of concrete, block, steel and drainage rather than a rough allowance
- The planning decision notice — reveals conditions that affect sequencing, materials or what has to be approved before work can start
- Pre-commencement conditions specifically — flag anything that legally has to be discharged before a digger can move, which changes the programme, not just the price
- Building Regulations drawings — where these differ from the planning set, the contractor needs the version that will actually be built and inspected
- Structural engineer's drawings and calculations — fix foundation depth, reinforcement and steel sizes, which are usually the single largest variable in a groundworks price
- Drainage design — confirms pipe runs, invert levels and connection points, so excavation depths and lengths are known rather than assumed
- A topographic survey — sets real levels across the site, so cut-and-fill, retaining walls and drainage falls are calculated, not guessed
- Ground investigation results — inform foundation type and depth, and flag problem ground, contamination or high water tables before they become a mid-job surprise
- Utility information — avoids striking live services during excavation, and flags any diversion costs before they appear as a variation
- A specification or schedule of works — removes ambiguity about exactly what is included, which is where many disputes between client and contractor start
- Your programme or start date — lets the contractor sequence around lead times for materials, subcontractors and any conditions still to be discharged
- Your budget range — lets the contractor advise honestly on what is realistic within it, rather than pricing a scheme that has to be value-engineered later
- Known constraints — access restrictions, working hours, protected trees or shared driveways all change how a job is sequenced and should be priced in from the outset, not discovered on day one
How thin information turns into a rough estimate
Without drawings, a contractor is pricing floor area and rough guesswork against typical build-ups — a reasonable starting point for a conversation, but not a number to plan a budget around. Every missing item forces an assumption: an assumed foundation depth where no ground information exists, an assumed access route where no photographs have been sent, an assumed drainage strategy where none has been designed. Assumptions are not wrong on purpose, but they are a source of later variation whenever reality turns out to differ from the assumption made at pricing stage.
This is why two contractors quoting from the same thin brief can produce very different numbers — not because one is more expensive, but because they made different assumptions to fill the same gaps.
What to do if some of this does not exist yet
It is normal for early-stage projects to be missing most of this list. A site visit and a conversation with SHS usually establishes, in that case, what still needs commissioning and from whom — a topographic survey, a structural engineer, a percolation test, or a drainage designer, depending on the project. Sending what you already have is still worthwhile at that stage: it shapes the conversation and avoids repeating information later.
Sequencing what you commission
Not everything needs commissioning at once, and getting the order right saves money. A topographic survey generally comes first, because levels affect almost every other decision. A structural engineer usually needs that survey, plus architect's drawings, before producing calculations. Drainage design and a percolation test can often run in parallel with structural work. Ground investigation is worth commissioning early on any site where conditions are uncertain, because a redesigned foundation after other work has been done is the most expensive kind of change to make.
A sensible order for commissioning information
- 01Architect's drawings — plans, elevations, sections
- 02Topographic survey, where levels are not already known accurately
- 03Ground investigation, where conditions are uncertain
- 04Structural engineer's design, once drawings and ground information exist
- 05Drainage design and percolation test, run alongside structural design
- 06Final specification and schedule of works, once the above are settled
Where to send it
The quickest way to get all of this in front of SHS in one place is the Send Us Your Plans upload page, where drawings, photographs and documents can be submitted together with a short description of the project. There is no need to wait until the checklist is complete — sending what exists now, and flagging what is still outstanding, is enough to start a proper conversation grounded in real information rather than a floor area alone.
What SHS can help with
SHS is the contractor, not the planning authority. What SHS can do is look at the information you already hold from a build point of view — access, ground conditions, levels, drainage, foundations and buildability — and tell you plainly what the construction side is likely to involve.
If drawings already exist, send them. If they do not, a site visit and a conversation usually establishes what information you need to gather next and who you need it from.
Worth answering before you start
- Do scale drawings exist, and are they the most current revision?
- Has a structural engineer produced foundation and steel details yet?
- Can you photograph the full access route, including any pinch points?
- Is there a planning decision notice, and does it carry any conditions?
- What is your realistic budget range and start date?
Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.
Frequently asked questions
Send whatever you do have — even a sketch, photographs and a description of what you want to achieve. SHS can advise what to commission next and from whom, such as an architect, engineer or surveyor.
Official sources — check with
Related services
Service
Groundworks & Civil Engineering
Site preparation, excavation, foundations, drainage and external works delivered as one coordinated groundworks package.
Service
Foundations
Strip, trench-fill, pad and reinforced foundations built to engineer's detail and building control inspection.
Service
Extensions
Extension groundworks, foundations, drainage, masonry and steel through one accountable contractor.
Related guidance
Technical
Structural engineering
When an engineer is needed, what their design contains, and how it turns into buildable groundworks and steelwork.
Practical
Site access
On rural Cumbrian sites, access is regularly the single largest variable in the price — and the easiest thing to under-check before pricing.
Regulation
Building Regulations
A separate legal process from planning, covering structure, safety and performance rather than whether the development is acceptable.
Related reading
Insights
How to Prepare for a Groundworks Quotation
What to gather before a site visit, why each item improves pricing accuracy, and what makes two quotations genuinely comparable.
Insights
What Information Should I Send a Groundworks Contractor?
A concise, practical checklist of what genuinely helps a contractor quote accurately — and why photographs are often as useful as drawings.
Have drawings or site photos?
Send them to SHS and we can review the construction side of the project.
Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.
Next step
Planning a project in Cumbria?
Tell SHS what you are building, repairing or preparing. Upload photographs, drawings or plans and the project can be reviewed before a site visit is arranged.