Regulation
Building Regulations
A separate legal process from planning, covering structure, safety and performance rather than whether the development is acceptable.
Last reviewed 2026-09-07
Planning permission and Building Regulations approval answer two completely different questions. Planning asks whether a development is acceptable in principle — its use, scale, appearance and impact on neighbours and the area. Building Regulations ask whether it is built to acceptable standards of structure, safety, health and energy performance. A project can have full planning permission and still fail Building Regulations, or vice versa on smaller works that fall outside planning control altogether but still need regulation compliance.
SHS builds to Building Regulations requirements as part of normal construction practice, and works with the appointed Building Control body through inspection stages. SHS is not Building Control and does not issue approvals or completion certificates — that sits with the local authority Building Control service or a registered building control approver acting independently of the contractor.
Quick answer
Almost all extensions, new dwellings, structural alterations and many conversions need Building Regulations approval, even where planning permission is not required at all.
Approval is obtained from either the local authority Building Control service or a registered building control approver (the current term for what used to be called an approved inspector) — the choice is the client's or their agent's to make.
Work proceeds in inspected stages; getting ahead of an unbooked inspection, particularly below ground, is one of the most common and costly programme mistakes.
Planning permission vs Building Regulations
It helps to think of them as two separate gatekeepers looking at different things. Planning is concerned with whether you should be allowed to build something in this location, at this size, in this form. Building Regulations are concerned with whether the thing that gets built is structurally sound, safe, healthy to live in and reasonably efficient — regardless of whether planning permission was needed to build it.
This is why routine work that falls entirely within permitted development for planning purposes, such as many single-storey extensions, still needs Building Regulations approval in full.
What Building Regulations actually cover
The Approved Documents set out guidance against the current Building Regulations for England, organised broadly by topic. Requirements are updated periodically, so always check the current version rather than relying on what applied to a previous project.
- Structure — foundations, walls, floors, roofs and their ability to carry load safely
- Drainage — foul and surface water systems, falls, materials and testing
- Thermal performance — insulation levels, thermal bridging and, for new dwellings, whole-building energy performance
- Ventilation — background and purge ventilation, extract in wet rooms and kitchens
- Fire safety — means of escape, fire-resisting construction, compartmentation
- Damp and moisture — damp proof courses and membranes, weathertightness
- Stairs, ramps and guarding — rise and going, headroom, handrails and guarding heights
- Electrical safety — competent-person certification for notifiable electrical work
| Stage | What is checked | Why it is a hold point |
|---|---|---|
| Foundation excavation | Depth, width, ground conditions, proximity to trees or drains | Concrete cannot be poured until the base is approved |
| Foundation concrete | Mix, reinforcement (if any), cover | Confirms the design has been built as specified |
| Damp proof course/membrane | Continuity and position relative to ground level | Covered by later work if not checked now |
| Drainage before backfill | Falls, bedding, pipe material and joints | Buried once backfilled — cannot be checked later |
| Drainage testing | Air or water test result | Confirms the system does not leak before it is covered permanently |
| Oversite and floor construction | Sub-base, insulation, damp proof membrane, screed | Sets thermal and damp performance for the life of the building |
Building control bodies and current terminology
Building control functions can be carried out by the local authority Building Control service, or by a registered building control approver working under the current registration regime for building control professionals. Whichever route is chosen, they must be formally engaged before work starts — retrospective sign-off is not straightforward and can require opening up completed work.
At the end of the job, satisfactory completion is confirmed through a completion certificate (local authority route) or a final certificate (registered approver route). This paperwork matters for future sales, mortgages and insurance, so it should be filed and kept, not just accepted verbally on site.
Why the inspection sequence affects programme
Inspections generally need to be booked with notice, and work should not proceed past a hold point until it has been signed off — pouring over an uninspected foundation or backfilling an untested drain run risks having to expose it again, at cost and delay. Building the inspection sequence into the programme from the outset, including who is responsible for booking each visit, avoids the most common site delays on regulated stages.
Building notice vs full plans application
Where the local authority route is used, there are generally two ways to apply: a full plans application, where drawings and calculations are checked and approved before work starts, and a building notice, where work can start with less upfront checking but carries more risk if something is later found not to comply. Full plans is usually the better route for anything beyond simple domestic work, because problems are caught on paper rather than on site.
A registered building control approver works differently again, engaging directly with the design team and carrying out inspections under their own registration rather than the local authority's. Whichever route is chosen, it needs to be settled and the body formally notified before excavation starts, not part-way through.
Structural, thermal and drainage compliance in groundworks
Below-ground and early-stage work carries a disproportionate share of Building Regulations risk because so much of it is covered up quickly. Foundation type and depth need to suit the ground actually found on site, not just the ground assumed at design stage — a hold point exists at excavation partly so the inspector can confirm the ground matches the design.
Thermal performance requirements affect groundworks more than people expect: insulation position and thickness under a slab, edge insulation to avoid cold bridging at the perimeter, and the position of the damp proof membrane relative to the insulation all have to be right first time, because none of it is visible once the floor is finished.
Retrospective work and unauthorised building work
Work carried out without the required Building Regulations approval does not become compliant simply by being finished — a regularisation application can sometimes be made after the fact, but it usually costs more than doing it properly at the time, because completed work often has to be exposed again for inspection. This is a particular risk when buying a property with undocumented past extensions or conversions, where a lack of a completion certificate is worth investigating before purchase, not after.
How Building Regulations interact with planning conditions
Planning conditions and Building Regulations requirements sometimes overlap — a condition might, for example, require a specific level of thermal performance or a particular drainage strategy that also needs to satisfy Building Regulations. The two processes are checked by different bodies and do not automatically share information, so confirming that a design satisfies both, rather than assuming one covers the other, avoids a project meeting one requirement and failing the other.
What SHS can help with
SHS is the contractor, not the planning authority. What SHS can do is look at the regulated stages of your build from a build point of view — access, ground conditions, levels, drainage, foundations and buildability — and tell you plainly what the construction side is likely to involve.
If drawings already exist, send them. If they do not, a site visit and a conversation usually establishes what information you need to gather next and who you need it from.
Worth answering before you start
- Is Building Control being handled by the local authority or a registered building control approver?
- Which stages on this project need inspecting, and how much notice does the inspector need?
- Who is responsible for booking each inspection — the contractor, the client or an agent?
- Has a completion or final certificate been obtained and filed for previous work on the property?
- Does the current Approved Document guidance for this element reflect the latest update?
Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.
Frequently asked questions
In almost all cases, yes. Building Regulations approval is assessed separately from planning permission and applies to most structural, drainage, insulation and safety-related work regardless of whether planning permission was required.
Official sources — check with
Related services
Service
Foundations
Strip, trench-fill, pad and reinforced foundations built to engineer's detail and building control inspection.
Service
Drainage
Foul and surface water drainage installed to falls, tested and detailed for inspection.
Service
Concrete Works
Slabs, floors, bases, aprons and reinforced concrete, placed and finished to the required tolerance.
Service
Groundworks & Civil Engineering
Site preparation, excavation, foundations, drainage and external works delivered as one coordinated groundworks package.
Related guidance
Residential
Extensions
Planning route, regulations, neighbours and the groundworks questions that decide extension cost.
Residential
New builds
From plot to foundations — what to resolve before a new build breaks ground.
Technical
Drainage
Drainage has to be decided before the slab goes down, not during the build — and Cumbrian sites often need an off-mains and site-specific approach.
Related reading
Insights
What Happens Before Groundworks Begin?
Everything that needs to be in place before excavators arrive on site: information, permissions, services, access, setting out and the checks that prevent a slow start.
Insights
How Much Do Foundations Cost?
Why foundation costs vary so widely: depth, ground conditions, foundation type, concrete volume and access for the pour.
Have drawings or site photos?
Send them to SHS and we can review the construction side of the project.
Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.
Next step
Planning a project in Cumbria?
Tell SHS what you are building, repairing or preparing. Upload photographs, drawings or plans and the project can be reviewed before a site visit is arranged.