Agricultural buildings

Prior approval, siting, access and the yard works that make a building usable.

Last reviewed 2026-09-07

Agricultural development has its own planning framework, distinct from the general residential and commercial system, and it is genuinely more complex than it first appears. Whether a building qualifies for a permitted development route — including prior approval, where the authority is notified and can require design conditions without a full application — depends on the holding's size, its established agricultural use, the scale of the proposed building, and its purpose. None of these thresholds should be assumed; they change periodically and must be checked against current guidance for the specific holding.

National Park designation changes what is available. Do not assume a route that applies to a lowland farm elsewhere in Cumbria applies in the same way inside the Lake District or Yorkshire Dales — agricultural permitted development rights can be more restricted, and design and siting are scrutinised more closely, inside a National Park.

Quick answer

Some agricultural buildings can proceed through a prior approval or agricultural permitted development route rather than full planning permission, but eligibility depends on holding size, established use and the building's scale and purpose — this must be confirmed with the planning authority before design work proceeds.

Full planning permission is the fallback route where a proposal does not meet permitted development criteria, or where the intended use is not genuinely agricultural — for example, new-build structures aimed primarily at diversification or non-agricultural income.

Siting, access, drainage and landscape impact are examined even under prior approval — it is not a design-free route.

Establish the route first

Before design work starts, establish with the planning authority which route applies to the holding and the specific proposal. That single conversation, made early, frequently saves months of abortive design work later. Points worth clarifying at that stage include whether the holding meets the area and use tests for agricultural permitted development, whether the proposed building's floor area and height fall within the current allowances, and whether the site sits within a defined distance of a residential curtilage — a common trigger for needing full permission instead.

Prior approval, where it applies, still requires the authority to assess siting, design and external appearance, and it can refuse or impose conditions on those grounds even though it is not a full planning application. Landscape and visual impact carry particular weight in a county with as much open, visually sensitive farmland as Cumbria.

Siting, scale and access

Siting decisions affect both the planning outcome and the practical running of the building for years afterwards. Distance from watercourses, visibility from public roads and rights of way, proximity to residential property, and the building's relationship to existing farm buildings are all planning considerations as well as operational ones.

Access — the route in for construction traffic and the ongoing route for agricultural vehicles, including whether an existing farm track needs widening, strengthening or a new junction onto the public highway — is frequently a condition of any consent and a genuine construction cost in its own right on rural sites with soft ground or long approach tracks.

The groundworks that make it work

A shed on its own is rarely the whole job. The works around it usually are, and they are where budgets are most often underestimated.

  • Base and slab design for the actual loading the building will see — livestock, machinery, silage, or general storage each load a slab very differently
  • Yard levels and falls so surface water runs where it should, not into buildings or watercourses
  • Clean and dirty water separation, which is both good practice and, on livestock buildings, often a regulatory requirement in its own right
  • Access and turning space for the largest vehicle actually used on the holding, not just the vehicles used today
  • Retaining structures where the site is cut into a slope, common on Cumbrian fellside farms
  • Underground services and drainage connections, including any new watercourse crossings or culverts, which may need separate consent from the Environment Agency or local authority

Future use and diversification

A building erected under an agricultural planning route is generally expected to be used for agriculture. Converting it later to a non-agricultural use — storage for another business, a workshop, tourism accommodation, or residential conversion — is a separate planning matter and is not automatic, however long the building has stood. If diversification is part of the long-term plan for a building, it is worth raising with the planning authority before construction, not after.

Environmental permits and pollution control

Some agricultural buildings and yards need permits or consents that sit entirely outside the planning system, most commonly around slurry and silage storage, and any structure or activity with the potential to pollute a watercourse. Storage capacity, distance from watercourses and boundaries, and construction standards for slurry stores are typically governed by separate regulations, and the Environment Agency should be consulted directly for any building storing slurry, silage effluent or fuel above a threshold quantity.

New or altered watercourse crossings, culverts, or land drainage works on or near a main river can themselves require a separate consent, and should not be assumed to be covered by a planning permission for the building itself.

Types of building and the route that usually applies

The table below is a general orientation only — every holding and building must be checked individually against current thresholds, since area and use tests change periodically and a building's classification is not always obvious from its name.

Building typeRoute most often consideredExtra checks that usually apply
General storage / machinery shed on an established holdingAgricultural permitted development or prior approvalArea and use tests, distance from residential curtilage
Livestock building with slurry or effluent storagePrior approval or full permission, plus environmental permitEnvironment Agency consent, watercourse distance
New building on a small or non-established holdingOften full planning permissionGenuine agricultural need, holding size tests
Building intended partly for diversification (retail, storage-for-hire, tourism)Full planning permissionChange of use considerations from the outset
Typical route by building type (indicative — always confirm current thresholds with the planning authority)

A typical sequence for a straightforward agricultural building

Where full planning permission or prior approval is confirmed as the right route, the practical sequence usually looks like this.

Typical sequence

  1. 01Confirm the planning route with the authority before committing to a design or a builder
  2. 02Agree siting, access and materials, and submit prior approval or full application as required
  3. 03Resolve any Environment Agency permit needs for slurry, silage or watercourse works in parallel
  4. 04Once consented, set out levels and drainage falls for the yard before the slab or base is formed
  5. 05Form the base to the loading the building will actually see, then erect the structure
  6. 06Complete access, yard drainage and any clean/dirty water separation before the building is brought into use

Working farms and construction sequencing around ongoing operations

Most agricultural building projects happen on a working farm, not a clear site, and sequencing needs to account for livestock movements, seasonal work such as lambing, calving or harvest, and shared use of tracks and yards with ongoing farm traffic throughout construction. Agreeing a sequence and temporary access arrangement with the farm before work starts avoids conflicts that are otherwise discovered on day one.

Weather and ground conditions also affect programme more on working farms than on many other sites, since heavy plant sharing wet, unmade tracks with livestock and farm vehicles can quickly make an access route unusable for both purposes if it is not managed carefully from the outset.

Materials and construction on farm sites

Agricultural buildings are usually straightforward structures — steel portal frames, concrete panel walls, fibre cement or steel roof sheeting — but the base and yard around them carry most of the site-specific risk. Concrete specification for a slab taking regular machinery or livestock loading is different from a domestic slab, and getting the mix, thickness and reinforcement wrong is expensive to correct once the building is up.

Where a building sits on soft or variable ground, a proper ground investigation before the slab is designed avoids later settlement or cracking, particularly on fellside or reclaimed farmland where made-up ground is common.

What a contractor needs to price a farm building accurately

A groundworks contractor pricing an agricultural building needs more than a floor plan and a rough footprint. The information below removes the assumptions that most often cause a price to move once work starts on a working farm.

Information that improves pricing accuracy for a farm building

  • Confirmed planning route and any conditions attached to prior approval or permission
  • Structural engineer's foundation and steel design, once available
  • Ground investigation results, or confirmation that ground conditions are unknown
  • Intended use and loading — livestock, machinery, silage, or general storage
  • Access route photographs, including the largest vehicle that will use it during construction and afterwards
  • Any existing services, drains or watercourses crossing the site
  • Whether clean and dirty water need separating, and any existing yard drainage to tie into

What SHS can help with

SHS is the contractor, not the planning authority. What SHS can do is look at the building and the yard around it from a build point of view — access, ground conditions, levels, drainage, foundations and buildability — and tell you plainly what the construction side is likely to involve.

If drawings already exist, send them. If they do not, a site visit and a conversation usually establishes what information you need to gather next and who you need it from.

Worth answering before you start

  • Which planning route applies to this holding — agricultural permitted development, prior approval, or full planning permission?
  • Does the proposal meet the current area, scale and use tests for that route?
  • What loading will the slab take, and does the design account for it?
  • How is clean and dirty water being separated?
  • Can the largest vehicle used on the holding get in and turn?
  • Does the site need cutting into a slope, and does that require retaining structures?
  • Is any future non-agricultural use of the building anticipated, and has that been discussed with the planning authority?

Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.

Frequently asked questions

Often yes, and it is separate from planning permission. Storage capacity, construction standard and distance from watercourses are typically governed by environmental regulations enforced by the Environment Agency, and should be checked alongside, not instead of, the planning route for the building itself.

Related services

Related guidance

Related reading

Have drawings or site photos?

Send them to SHS and we can review the construction side of the project.

Planning and regulatory requirements vary by property, location and project. SHS provides practical construction guidance but does not replace advice from the relevant planning authority, Building Control, architect, engineer or other qualified professional.

Next step

Planning a project in Cumbria?

Tell SHS what you are building, repairing or preparing. Upload photographs, drawings or plans and the project can be reviewed before a site visit is arranged.

Call SamProject DirectorSite visit